Important note: The companies referenced are for illustrative purposes only in order to demonstrate the investment strategy on the date stated. The companies are not necessarily held by Robeco’s Smart Energy strategy. This is not a buy, sell or hold recommendation, nor should any inference be made on the future development of the company.
Footnotes
1 Moving from two decades of less than 1% growth to 2.4% CAGR through 2035.
2 ‘Power check: Watt’s going on with the grid?.’ Bank of America Global Research. July 2025.
3 Energy consumption figures for Italy, Germany and France are for 2023.
4 US Energy Information Administration, February 2024. US Department of Energy, Transmission Interconnection Roadmap: Transmission Interconnection by 2035.
5 ‘Half US at high risk of power shortfall in next decade, regulators says. Reuters, December 2024.
6 Electricity is more expensive in peak hours due to high demand. Capacity pricing refers to the extra cost paid by end-consumers to ensure electricity that is available on-demand. PJM refers to the regional grid operator for the US Mid-Atlantic and Midwest regions. These represent major economic and population hubs which can reliably proxy broader trends in US electricity use.
7 US Energy Information Administration, 2025.
8 The average construction time is 9.5 years globally. World Nuclear Performance Report, World Nuclear Association, 2025. This figure varies significantly by region and reactor type. China achieves shorter construction time due to standardized designs and streamlines regulatory processes. Western countries tend to have longer timelines frequently exceeding 15 years due to complex permitting, financing among other challenges. (IEA, JP Morgan)
9 IEA World Energy Outlook, 2024.